NC-METH-001 v1.1.0-revA — Part C: Per-Typology Specifications

T1 / T2 / T4A / T4B-DC / T6W / BESS — Identity, Geometry, Capacity, CAPEX, Yield, Offtaker, Suitability, Failure Modes

12 May 2026 · Internal · Author: AI-assisted, M. Forni review


⚠️ Revision note — what changed from v1.1.0

This revision (revA) supersedes Part C v1.1.0 issued earlier the same day. The substantive change:

v1.1.0 included a "methodology canonical" comparison column for per-typology CAPEX (T1 $645, T2 $820, T4A $950, T4B-DC $1,350, T6W $1,150). Those numbers were imported from the retracted Phase 3B desk bottom-up and are not sourced from any documented methodology artefact. The label "methodology canonical" was false.

The corrected position: - The LC v1.0 segment register per-typology unit costs are the only canonical CAPEX numbers (T1 $412, T2 $813, T4A $742, T4B-DC $700, T6W $732) - The memory's locked range "Solar $700–1,100/kWp (TOPCon 610Wp)" is the canonical range; T1 at $412 sits below this range and is flagged for engineering review priority - No per-typology methodology canonical CAPEX exists yet; building one is the AUDIT-040 / Annex H gap closed via WP2 + WP4

All other content in Part C v1.1.0 (typology identity, geometric constraints, capacity formulas, yield models, offtaker logic, suitability screens, failure modes, locked vs estate-specific parameters) is unchanged. The CAPEX section of each typology (C.X.4) is revised. Section C.7 cross-typology summary table needs no change (it never had the bad comparison column). Section C.8 acknowledged gaps is revised to state the Annex H gap correctly.

v1.1.0 is retracted; revA is canonical going forward.


C.0 Overview

Part C documents the six module types covered by the IEAT Solar methodology. Each subsection follows the same template:

  • Physical and economic identity — what the typology IS, what it does, where deployed
  • Geometric constraints — geometric filters from B.2 with explicit thresholds
  • Capacity formula — kWp/m² coefficient and applicable adjustments
  • CAPEX formula — LC v1.0 register canonical + memory range context + structural premium adjustments
  • Yield model — estate-canonical P50 + typology-specific adjustments
  • Offtaker logic — default attribution rule + edge cases
  • Suitability screen — which estates this typology applies to and why
  • Failure modes — what can go wrong; risk register input
  • Locked vs estate-specific parameters — what's universal vs what tunes per estate

The six typologies are deliberately heterogeneous: T1–T2 are mature commercial-scale solar deployment patterns; T4A is parking infrastructure commercially proven globally; T4B-DC and T6W are LC-pioneered patterns where IEAT's industrial-estate context creates LC-specific deployment economics; BESS is the storage layer that pairs with several of the above.

Note on typology numbering: "T1 / T2 / T4A / T4B-DC / T6W" reflects historical development sequence at NewCo. T3 (industrial walkway), T5 (retired), and intermediate variants exist in historical artefacts but are not part of the canonical six. Reserve typologies (T1X / T2X / T6X) are addressed at the end of each parent typology's section.

Note on canonical CAPEX: Per the revision note above, the only documented canonical per-typology CAPEX is the LC v1.0 segment register. The memory-locked range is $700–1,100/kWp at TOPCon 610Wp; per-typology methodology canonical does not yet exist. Annex H (per AUDIT-040, delivered through WP2 + WP4 engineering review) will produce it.


C.1 T1 — Rooftop

C.1.1 Physical and economic identity

T1 is industrial and commercial rooftop PV: solar modules mounted on the roof of an existing IEAT-owned admin building, IEAT-owned factory building, or tenant-owned building with consent. The roof acts as the structural support; ballast or penetration-anchored racking sits on the roof; modules cable down to a string inverter, then to a roof-edge AC busbar or directly to the building's MV switchgear for self-consumption.

T1 is the lowest-CAPEX typology in the family per kWp at LC. The economic advantage at LC comes from three sources: (a) zero foundation work (the roof IS the foundation); (b) no land cost or site preparation; © shortest cable runs to point of consumption (most BTM-friendly). Trade-off: smallest per-segment capacity (typical 100–300 kWp per building), highest tenant-coordination burden, structural integrity uncertainty until ROOF-001 assessment closes.

LC has 12 T1 segments totalling 2.15 MWp / $0.89M (6% of envelope by MWp; 4% by CAPEX). Eleven are IEAT-direct (admin buildings); one is tenant-attributed (Sankyu LC-T1-10).

C.1.2 Geometric constraints

  • Roof area: > 500 m² minimum
  • Roof type: flat or low-slope (< 5° pitch); pitched > 25° excluded
  • Building age: < 30 years (ACM presence risk in older industrial buildings)
  • Ownership: IEAT-owned admin or factory OR tenant-owned with consent
  • Roof access: stair or ladder access available; crane access feasible for installation
  • Roof penetrations: HVAC, exhaust, water tanks, antennas navigable

C.1.3 Capacity formula

Capacity = roof area × layout efficiency × module density

  • Module density: 254 W/m² nameplate (TOPCon 610Wp on 2.4 m²)
  • Layout efficiency: 50–60% for flat rooftops (after setbacks + obstructions + access)
  • Effective deployable density: 130–160 W/m²

For a typical 1,000 m² industrial rooftop: ~140 kWp.

C.1.4 CAPEX formula

CAPEX = kWp × unit cost

  • LC v1.0 unit cost (canonical): $412/kWp
  • Memory-locked canonical range (Solar $700–1,100/kWp per memory edit 16, TOPCon 610Wp basis): $700–1,100/kWp
  • ⚠ T1 at LC sits below the memory canonical range. Three possibilities: (a) genuine LC-specific advantage (zero-foundation rooftop installation on existing IEAT admin buildings; small per-segment scale; shortest cable runs); (b) systematic understatement in LC v1.0 register; © the memory range is a project-blend rate that doesn't represent the floor for the simplest typology. T1 unit cost is the highest-priority engineering review item in WP2 — confirm $412 is achievable or revise.
  • Per-typology methodology canonical: not yet documented; AUDIT-040 / Annex H gap. WP2 + WP4 produce it via engineering review.
  • Premium adjustments:
  • C4 corrosion premium for coastal estates: +10–15% for marine-grade BOS components [AUDIT-002 verification pending WP4]
  • ACM remediation premium for buildings flagged: +$15–25K per building (separate work scope, not in $/kWp)
  • Roof reinforcement premium where structural capacity marginal: +$30–80K per building if ROOF-001 requires beam upgrades

C.1.5 Yield model

  • Estate-canonical P50: estate's RES-001 number (LC 1,485 methodology / 1,380 model — pending WP1)
  • Rooftop-specific adjustment: −3% to −5% for low-tilt rooftop installations in tropics
  • Bifacial uplift: 0% (rooftop reflective surface low)
  • Soiling: per estate canonical; rooftop slightly better than ground (less dust)
  • Y1 effective P50 for LC T1: 1,330–1,410 kWh/kWp/yr (rooftop-adjusted from estate canonical)

C.1.6 Offtaker logic

Per B.6: - IEAT-owned admin building → IEAT-direct (LC default; 11 of 12 LC T1 segments) - IEAT-owned factory with single tenant → IEAT-direct by default - Tenant-owned building → tenant-direct ESA required (LC: LC-T1-10 Sankyu, 0.65 MWp)

C.1.7 Suitability screen

Estate Suitability Notes
LC HIGH 12 segs / 2.15 MWp; IEAT admin + factory coverage strong
BP HIGH Similar admin + factory profile; larger contiguous footprint
MTP HIGH Massive admin + petrochemical factory rooftops
MTP Port MEDIUM Mixed industrial; some marine-corrosion concerns
Bangplee MEDIUM Land-lease estate; tenants own buildings; consent-heavy
Lat Krabang MEDIUM Land-lease estate; similar to Bangplee
Lamphun LOW Land-lease estate; smaller building footprint
Smart Park MEDIUM Newer development; admin building only
Songkhla MEDIUM Coastal corrosion; mature tenant base
Songkhla-S MEDIUM Similar to Songkhla
Phichit LOW Northern; smaller industrial footprint
Sa Kaeo LOW Eastern; smaller building footprint
Bang Chan LOW Older estate; building age concerns
Kaeng Khoi MEDIUM Newer EEC-adjacent
Nakhon Luang MEDIUM Mixed

C.1.8 Failure modes

  • Roof age and condition uncertainty until ROOF-001 + ACM screening
  • Roof age > 30 years excludes building entirely
  • ACM remediation required in 1990s-and-earlier industrial roofs; 12–24 week delay
  • Structural capacity marginal: reinforcement required or T1 segment dropped
  • Penetration leaks: ballast-anchored preferred
  • Tenant consent withdrawal (tenant-attributed T1) — small replacement reserve (T1X)
  • Rooftop equipment changes during operations period

C.1.9 Locked vs estate-specific parameters

Parameter Status Value / range
Module: TOPCon 610Wp LOCKED per memory edit 16
Roof perimeter setback LOCKED 1.0 m
Roof equipment setback LOCKED 0.5 m
Roof access hatch setback LOCKED 2.0 m
Layout efficiency ESTATE-SPECIFIC 50–60% based on building density and obstructions
Unit cost ($/kWp) ESTATE-SPECIFIC (canonical TBD) LC v1.0 $412; methodology canonical pending Annex H
Building age limit LOCKED 30 years
Pitch limit LOCKED < 5° flat / low-slope
Roof reinforcement premium ESTATE-SPECIFIC per ROOF-001 outcome
Tenant ESA premium ESTATE-SPECIFIC tenant-direct vs IEAT-direct margin

C.1.10 T1X reserve typology

T1X (building extension) is the aspirational reserve: rooftop extensions on existing IEAT buildings. LC's T1X reserve is 0.5 MWp / $0.21M. Same parameters as T1 with confidence < 0.20; promoted into active envelope only after Phase 0B owner confirmation and structural assessment.


C.2 T2 — Ground-mount

C.2.1 Physical and economic identity

T2 is utility-style ground-mount PV: modules on fixed-tilt or single-axis tracker structures on unused parcels, buffer strips, or easement land within the IEAT estate boundary. Foundations are typically shallow piles into compacted soil; modules tilt at ~10–15° in the tropics; row spacing managed for shading minimisation and access.

T2's economic profile is mid-range: higher CAPEX than T1 (foundations + site prep) but larger per-segment capacity (typical 200 kWp–2 MWp per parcel) and standardised installation (T2 is the global commercial-scale solar default). Land cost is zero within IEAT concession; site preparation modest.

LC has 7 T2 segments totalling 4.35 MWp / $3.54M (13% of envelope by MWp; 14% by CAPEX). Six are IEAT-direct buffer parcels; one is tenant-attributed (LC-T2-07 Michelin, 0.45 MWp).

C.2.2 Geometric constraints

  • Parcel area: > 1,000 m² minimum
  • Unbuilt status: per satellite imagery + IEAT cadastral
  • Easement-free: no utility easements conflicting with module rows
  • Buffer-strip eligibility: where parcel is a buffer strip, IEAT must confirm availability
  • Boundary setbacks: 5 m from estate boundary, IEAT-determined fire lanes, drainage easements
  • Soil quality: bearable load capacity for pile foundations (> 50 kPa); avoid contaminated soils

C.2.3 Capacity formula

Capacity = parcel area × layout efficiency × module density

  • Module density: 254 W/m² nameplate
  • Layout efficiency: 40–55% for ground-mount
  • Effective deployable density: 100–130 W/m²

For a typical 5,000 m² buffer parcel: ~575 kWp.

C.2.4 CAPEX formula

CAPEX = kWp × unit cost

  • LC v1.0 unit cost (canonical): $813/kWp
  • Memory-locked canonical range: $700–1,100/kWp
  • T2 at LC sits comfortably within the canonical range. LC's $813 is mid-range — consistent with mature commercial-scale ground-mount economics.
  • Per-typology methodology canonical: not yet documented; AUDIT-040 / Annex H gap. T2 is the lowest-priority typology for Annex H given LC value is within memory range.
  • Build composition: ~50% modules + ~20% inverters + ~20% structural + ~10% civil
  • Premium adjustments:
  • C4 corrosion premium for coastal estates: +10–15%
  • Soil contamination remediation: +$50–150K per parcel if remediation required
  • Drainage / grading premium for sloped parcels: +5–10%
  • Substation extension if parcel far from existing MV switchgear: +$50–200K per parcel

C.2.5 Yield model

  • Estate-canonical P50: estate's RES-001 number
  • Ground-mount adjustment: 0% (this IS the optimal-tilt baseline)
  • Bifacial uplift: +5–7% if light-coloured ground (gravel, white-rock) — small at LC where parcels typically grassy
  • Soiling: standard estate canonical
  • Y1 effective P50 for LC T2: 1,380 (model) or 1,485 (methodology) per AUDIT-001 reconciliation

C.2.6 Offtaker logic

  • IEAT-retained buffer parcels → IEAT-direct (LC: 6 of 7 T2 segments)
  • Tenant-adjacent parcels with shared use → tenant-attributed (LC: LC-T2-07 Michelin)
  • Tenant-leased parcels with tenant-direct ESA → tenant-direct (rare in current LC inventory)

C.2.7 Suitability screen

Estate Suitability Notes
LC MEDIUM 7 segs / 4.35 MWp; smaller buffer parcels scattered
BP HIGH Large contiguous buffer parcels available
MTP HIGH Massive estate; ample buffer land
MTP Port MEDIUM Port operations constrain
Bangplee LOW Land-lease; limited IEAT-retained
Lat Krabang LOW Land-lease; limited IEAT-retained
Lamphun MEDIUM Buffer parcels available
Smart Park MEDIUM Newer; planned buffer strips
Songkhla MEDIUM Coastal
Songkhla-S+Rubber City HIGH Large estate
Phichit HIGH Smaller building density; more ground
Sa Kaeo HIGH Eastern, ample land
Bang Chan LOW Older estate, scarce buffer
Kaeng Khoi MEDIUM Newer
Nakhon Luang MEDIUM Mixed

C.2.8 Failure modes

  • Parcel boundary disputes — RTK GPS survey required (Phase 0B); IEAT cadastral may not match operational reality
  • Soil contamination from prior industrial use — heavy metals, hydrocarbons; remediation expensive
  • Drainage and flood-zone issues — particularly at coastal estates
  • Setback rules in conflict with parcel size — small parcels may lose 20–30% effective area
  • Soil bearing capacity inadequate — pile foundations need rework; cost premium 10–20%
  • MV grid connection distance — far parcels need substation extension

C.2.9 Locked vs estate-specific parameters

Parameter Status Value / range
Module: TOPCon 610Wp LOCKED
Row spacing LOCKED 2–3 module-heights (fence-to-fence)
Boundary setback LOCKED 5 m
Layout efficiency ESTATE-SPECIFIC 40–55%
Unit cost ($/kWp) ESTATE-SPECIFIC (canonical TBD) LC v1.0 $813; methodology canonical pending Annex H
Soil remediation premium ESTATE-SPECIFIC per Phase 0B soil assessment
Tilt angle ESTATE-SPECIFIC 10–15° tropic; lower for shaded sites
Tracker vs fixed ESTATE-SPECIFIC fixed-tilt default; tracker if parcel >10 MWp

C.2.10 T2X reserve typology

T2X (vacant buffer parcels) is the aspirational reserve below 0.20 confidence floor. LC's T2X reserve is 1.5 MWp / $1.22M. Phase 0A IEAT cadastral validation required for promotion.


C.3 T4A — Carport

C.3.1 Physical and economic identity

T4A is parking-lot canopy PV: solar modules on drilled-pier-supported steel canopy structures over passenger and light commercial parking. The canopy delivers shade (high tenant value) + generates solar (high investment value). Canopy spans 10–20 m clear width with 3.0 m soffit clearance.

T4A has the highest single-segment capacity in the family (LC's LC-T4A-01 is 2.88 MWp) because parking lots are large and contiguous. Economic profile: medium-high CAPEX (structural premium for canopy steel) offset by good kWp/m² density and dual-use value. Best-deployed on existing IEAT parking infrastructure where IEAT itself is offtaker.

LC has 7 T4A segments totalling 11.35 MWp / $8.42M (33% of envelope by MWp; 34% by CAPEX). All are IEAT-direct.

C.3.2 Geometric constraints

  • Parking width: 10/15/20 m standard spans
  • Clear soffit: 3.0 m clearance possible
  • Lot size: > 2,000 m²
  • Parking lot polygon: continuous, parking-only zone
  • Drainage: existing drainage adequate or upgradeable
  • Drilled-pier feasibility: subsurface conditions support 2–4 m drilled piers

C.3.3 Capacity formula

Capacity = parking area × layout efficiency × module density

  • Module density: 254 W/m² nameplate
  • Layout efficiency: 40–50% for carport
  • Effective deployable density: 105–125 W/m²

For LC-T4A-01 (the largest LC segment): ~125 W/m² × ~23,000 m² = 2.88 MWp ✓ matches register.

C.3.4 CAPEX formula

CAPEX = kWp × unit cost

  • LC v1.0 unit cost (canonical): $742/kWp
  • Memory-locked canonical range: $700–1,100/kWp
  • T4A at LC sits at the lower bound of the canonical range. Plausibly LC-specific advantages: 3.0 m soffit (standard parking, not low-clearance industrial); drilled-pier feasibility (paved compacted fill); IEAT-direct (no tenant negotiation premium); single-mobilisation procurement; standardised steel design. WP2 engineering review confirms or revises.
  • Per-typology methodology canonical: not yet documented; AUDIT-040 / Annex H gap. WP4 produces it.
  • Build composition: ~35% modules + ~30% structural steel + ~15% drilled piers + ~10% electrical + ~10% civil
  • Premium adjustments:
  • C4 corrosion premium for coastal estates: +10–15% for marine-grade steel
  • Drilled-pier geotechnical fail (rock layer or contaminated fill): +10–25% for alternate foundation
  • Lighting and EV charging integration: +$30–80K per segment (not in $/kWp)
  • Canopy aesthetic premium (tenant request, paint, branding): +5–8%

C.3.5 Yield model

  • Estate-canonical P50: estate's RES-001 number
  • Carport-specific adjustment: −1% to −2% for shading from light poles, signage
  • Bifacial uplift: +4–6% (parking asphalt has moderate albedo)
  • Soiling: similar to ground-mount; slightly worse if parking dust from vehicle traffic
  • Y1 effective P50 for LC T4A: ~1,400–1,510 kWh/kWp/yr

C.3.6 Offtaker logic

  • All IEAT parking infrastructure → IEAT-direct (LC: all 7 T4A segments)
  • Tenant-private parking (rare in IEAT estates) → tenant-direct ESA (sub-typology T4A-tenant)

C.3.7 Suitability screen

Estate Suitability Notes
LC HIGH 7 segs / 11.35 MWp; LC-T4A-01 flagship at 2.88 MWp
BP HIGH Comparable scale to LC
BP-S MEDIUM Smaller parking footprint
MTP MEDIUM Industrial parking sparse vs admin
MTP Port LOW Port operations limit parking
Bangplee LOW Tenant-owned parking
Lat Krabang LOW Tenant-owned parking
Lamphun LOW Limited parking footprint
Smart Park MEDIUM Newer; planned parking
Songkhla MEDIUM Coastal corrosion concern
Songkhla-S MEDIUM Similar
Phichit LOW Small footprint
Sa Kaeo LOW Small footprint
Bang Chan LOW Older estate
Kaeng Khoi MEDIUM Newer EEC-adjacent
Nakhon Luang MEDIUM Mixed

C.3.8 Failure modes

  • Drilled-pier geotechnical fail — rock layer, contaminated fill, or unstable soils require alternate foundation; cost +10–25%
  • Parking flow disruption during construction — IEAT and tenants need maintained parking access; phased construction adds 4–8 weeks
  • Canopy span design failure — wind loading, seismic considerations; span >20 m typically excluded
  • Rain runoff management — canopy drainage must integrate with existing parking drainage
  • EV charging integration scope creep
  • Tenant aesthetic objections at flagship admin areas

C.3.9 Locked vs estate-specific parameters

Parameter Status Value / range
Module: TOPCon 610Wp LOCKED
Soffit clearance LOCKED 3.0 m
Pedestrian setback LOCKED 0.5 m
Parking width spans LOCKED 10 / 15 / 20 m standard
Layout efficiency ESTATE-SPECIFIC 40–50%
Unit cost ($/kWp) ESTATE-SPECIFIC (canonical TBD) LC v1.0 $742; methodology canonical pending Annex H
Drilled-pier depth ESTATE-SPECIFIC 2–4 m typical
C4 corrosion premium ESTATE-SPECIFIC coastal vs inland
Lighting/EV integration ESTATE-SPECIFIC optional scope

C.4 T4B-DC — Arterial canopy (dual N/S)

C.4.1 Physical and economic identity

T4B-DC is arterial-road canopy PV with dual North/South orientation: modules mounted on a canopy spanning an internal road or arterial, with one face tilted North and the other tilted South. The dual orientation captures both AM (East-leaning South-face) and PM (West-leaning North-face) sun, maximising daily generation over a single-orientation canopy.

T4B-DC is LC-pioneered in the IEAT context. Most published utility carport designs use single-axis tilt. The dual-orientation pattern works because IEAT's internal road geometry is typically arterials running East-West, making North/South canopy orientation natural. Single-mobilisation deployment is the LC cost advantage.

LC has 16 T4B-DC segments totalling 1.83 MWp / $1.28M (5% of envelope by MWp; 5% by CAPEX). Eight are IEAT-side (West-side, IEAT-direct); eight are tenant-side (East-side, tenant-attributed).

C.4.2 Geometric constraints

  • Carriageway width: 6–9 m
  • Length: > 100 m
  • No overhead utilities: no overhead electric, telecom, or gas lines crossing the road
  • Bridge clearance: 5.0–6.0 m preserved
  • Pedestrian/cyclist provisions: side pathways preserved
  • Drainage: canopy drainage integrated with existing stormwater management

C.4.3 Capacity formula

Capacity = canopy area × layout efficiency × module density

  • Module density: 254 W/m² nameplate
  • Layout efficiency: 45–55% for dual N/S canopy
  • Effective deployable density: 110–135 W/m²

For a typical 1,000 m² T4B-DC segment: ~125 kWp.

C.4.4 CAPEX formula

CAPEX = kWp × unit cost

  • LC v1.0 unit cost (canonical): $700/kWp (single-mobilisation conditional)
  • Memory-locked canonical range: $700–1,100/kWp
  • T4B-DC at LC sits at the lower bound of the canonical range. The LC $700 number is conditional on single-mobilisation procurement (whole arterial in one EPC contract). If procurement forces phased deployment, the +25% premium applies and T4B-DC moves into the mid-range. WP4 documents the single-mob vs phased decision per estate.
  • Per-typology methodology canonical: not yet documented; AUDIT-040 / Annex H gap. T4B-DC is LC-pioneered, so the methodology canonical when built will inherit heavily from LC's deployment.
  • Phased deployment premium: +25% (i.e., $875/kWp) if procurement forces phased construction
  • Premium adjustments:
  • C4 corrosion premium for coastal estates: +10–15%
  • Overhead utility relocation premium: +$20–80K per segment (not in $/kWp)
  • Traffic management premium: +$10–30K per segment (signage, flagmen during construction)

C.4.5 Yield model

  • Estate-canonical P50: estate's RES-001 number
  • T4B-DC adjustment: +1% to +3% (dual N/S captures more daily sky than single-orientation)
  • Bifacial uplift: +4–6% (high albedo from road surface)
  • Soiling: typical estate canonical; slightly worse if dust from road traffic
  • Y1 effective P50 for LC T4B-DC: ~1,420–1,540 kWh/kWp/yr

C.4.6 Offtaker logic

Per B.6, per-side rule: - IEAT internal road (West-side) → IEAT-direct (LC: 8 of 16 segments) - Tenant-adjacent arterial (East-side) → tenant-attributed per side (LC: 8 segments; 5 named anchors + 3 mixed/inferred)

C.4.7 Suitability screen

Estate Suitability Notes
LC HIGH 16 segs / 1.83 MWp; rich internal road network
BP HIGH Similar internal road profile
Lat Krabang MEDIUM Land-lease but some IEAT-owned arterials
MTP HIGH Massive arterial network
MTP Port MEDIUM Port-internal arterials
Songkhla MEDIUM Mature road network
Other estates LOW–MEDIUM Smaller arterial networks

C.4.8 Failure modes

  • Phased vs single-mobilisation procurement — if EPC procurement forces phased, unit cost rises 25%; segment economics degrade
  • EPC procurement for arterial work — Thai EPC market may not have arterial-canopy-specialist firms
  • Traffic disruption during construction — internal road closures 4–8 weeks per arterial
  • Overhead utility relocation — some IEAT arterials have overhead electric or telecom
  • Tenant consent on tenant-side arterials
  • Drainage conflicts

C.4.9 Locked vs estate-specific parameters

Parameter Status Value / range
Module: TOPCon 610Wp LOCKED
Dual N/S configuration LOCKED per LC methodology pioneering
Carriageway edge setback LOCKED 0.5 m
Bridge clearance LOCKED 5.0–6.0 m preserved
Single-mobilisation procurement assumption ESTATE-SPECIFIC LC committed; BP TBD
Unit cost ($/kWp) ESTATE-SPECIFIC (canonical TBD) LC v1.0 $700 single-mob; methodology canonical pending Annex H
Layout efficiency ESTATE-SPECIFIC 45–55%
Carriageway width range LOCKED 6–9 m
Phased deployment premium LOCKED +25%

C.5 T6W — Wide canal canopy

C.5.1 Physical and economic identity

T6W is wide canal canopy PV: modules on fixed-portal-frame steel structures anchored to concrete-lined canal banks, spanning the canal. Frame portals at intervals (8–12 m apart) carry the modules at ~4–5 m above water level. Modules orient North-South across the canal width.

T6W is LC-pioneered in scale. Floating PV exists globally but canal-canopy (fixed structure, not floating) is LC-specific. The economic advantage is unique site availability (water surface that's not otherwise used) and low foundation cost (concrete-lined banks already exist as load-bearing). Trade-off: canopy structural complexity, biofouling and bird-management costs, water-level variation tolerance.

LC has 5 T6W segments totalling 14.91 MWp / $10.91M (43% of envelope by MWp; 44% by CAPEX). All five are tenant-attributed; three to Thai Summit Group (the concentration constraint).

C.5.2 Geometric constraints

  • Water width: > 15 m clear
  • Concrete-lined banks: load-bearing for portal foundations; soft/earthen banks excluded
  • Length: > 200 m
  • Bridge-free run: > 50 m between bridges
  • Water depth: 1.0–5.0 m typical; bathymetric survey verifies bottom conditions
  • Boat traffic: light or none
  • Pedestrian access: maintained at intervals (~100–200 m gaps)
  • Bird-management consideration: methodology requires bird deterrent strategy

C.5.3 Capacity formula

Capacity = canal area × layout efficiency × module density

  • Module density: 254 W/m² nameplate
  • Layout efficiency: 45–55% for canal canopy
  • Effective deployable density: 110–130 W/m²

For LC-T6W-01 (largest LC T6W): ~120 W/m² × ~35,000 m² = 4.20 MWp ✓ matches register.

C.5.4 CAPEX formula

CAPEX = kWp × unit cost

  • LC v1.0 unit cost (canonical): $732/kWp
  • Memory-locked canonical range: $700–1,100/kWp
  • T6W at LC sits at the lower bound of the canonical range. Plausibly LC-specific advantages: concrete-lined canal banks (load-bearing foundations exist); fixed-portal-frame standardised; IEAT canal corridors planned and accessible; portal spacing 8–12 m proven. Trade-off: T6W carries operational premiums (biofouling, bird-management, marine-grade if coastal) that don't show in $/kWp but DO show in OPEX. WP2 engineering review validates the LC CAPEX position.
  • Per-typology methodology canonical: not yet documented; AUDIT-040 / Annex H gap. T6W is LC-pioneered at scale, so the methodology canonical will inherit heavily from LC's deployment.
  • Build composition: ~30% modules + ~30% portal-frame steel + ~15% bank-anchored foundations + ~15% electrical + ~10% biofouling/bird management
  • Premium adjustments:
  • C4 corrosion premium for coastal-canal estates (LC, MTP Port): +15–20% (saltwater + humidity)
  • Bathymetric / dredging premium if canal bottom needs preparation: +5–10%
  • Bird deterrent system: +$15–30K per segment
  • Anti-soiling coatings: +\(0.5–1.0/kWp** (capex) + **+\)0.3/kWp/yr (opex)
  • Marine-grade vs standard steel: +10–15%

C.5.5 Yield model

  • Estate-canonical P50: estate's RES-001 number
  • T6W canopy adjustment: −1% to −2% (humidity from water; biofouling cumulative over 25 years)
  • Bifacial uplift: +1–2% (water albedo is moderate but variable)
  • Soiling: estate canonical, plus +1–3% biofouling allowance; requires monthly cleaning vs quarterly elsewhere
  • Y1 effective P50 for LC T6W: ~1,370–1,470 kWh/kWp/yr

C.5.6 Offtaker logic

Per B.6: - Adjacent to tenant operations → tenant-attributed default (LC: all 5 T6W segments) - LC-T6W-03 LC2 Power Plant special case: power-producer offtaker ESA sub-class — methodology should formalise this sub-class - Multi-tenant clusters: Thai Summit Group (LC-T6W-01, -02 = 7.85 MWp / $5.74M, 22% of LC envelope, single-group concentration)

C.5.7 Suitability screen

Estate Suitability Notes
LC HIGH 5 segs / 14.91 MWp; canal network well-suited
BP HIGH Similar canal network (subject to confirmation)
MTP MEDIUM Limited internal canals; mostly port
MTP Port MEDIUM Port canals + drainage
Other estates LOW Smaller or absent canal networks

C.5.8 Failure modes

  • Bank stability — bathymetric + bank-soundness survey required (Phase 0B)
  • Seasonal water-level variation — flood season vs dry season; canopy clearance must accommodate
  • Biofouling on submerged or wave-splash components
  • Bird/wildlife management — bird droppings on modules; ongoing opex
  • Boat traffic — even occasional navigation requires bridge gates or canopy elevation
  • Tenant consent withdrawal — Thai Summit Group concentration; T6X reserve is small (1.5 MWp / $1.10M); not sufficient to cover Thai Summit cluster refusal
  • LC2 Power Plant special case — power-producer offtaker ESA structure unique; legal opinion required before scale-up

C.5.9 Locked vs estate-specific parameters

Parameter Status Value / range
Module: TOPCon 610Wp LOCKED
Bank edge setback LOCKED 0.5 m
Water width minimum LOCKED 15 m clear
Length minimum LOCKED 200 m
Bridge-free run minimum LOCKED 50 m
Portal frame structure LOCKED fixed (not floating)
Concrete-lined banks requirement LOCKED load-bearing requirement
Pedestrian access intervals LOCKED every 100–200 m
Unit cost ($/kWp) ESTATE-SPECIFIC (canonical TBD) LC v1.0 $732; methodology canonical pending Annex H
C4 corrosion premium ESTATE-SPECIFIC coastal-canal estates
Biofouling cleaning frequency LOCKED monthly (vs quarterly elsewhere)
Bird deterrent strategy ESTATE-SPECIFIC per site

C.5.10 T6X reserve typology

T6X (drainage canal extension) is the aspirational reserve below 0.20 floor. LC's T6X reserve is 1.5 MWp / $1.10M. Phase 0B RTK GPS canal survey required for promotion.


C.6 BESS — Battery storage

C.6.1 Physical and economic identity

BESS (Battery Energy Storage System) is containerised lithium iron phosphate (LFP) storage paired with PV deployments. The methodology uses 5 MWh containers as the standard unit (40-ft ISO container with battery modules, BMS, inverters, fire suppression, HVAC for thermal management). Multi-container clusters at large sites.

BESS economics differ from PV. Revenue stack: - Curtailment recovery — store excess PV that would otherwise be curtailed - Demand charge management — shave evening demand peaks at host facility - Time-shift — discharge during higher-tariff periods (TOU peak hours) - Frequency regulation / ancillary services — rare in Thailand utility market; not currently modeled

LC is no-BESS by design per IC paper §1. BP and other EEC estates use BESS where curtailment risk or demand charge structure justifies.

C.6.2 Geometric constraints

  • Site area: ~50 m² per 5 MWh container
  • Adjacency: PV lot for curtailment-recovery sizing; load centre for demand-charge management
  • Access: service vehicle access
  • HVAC and ventilation: thermal management infrastructure
  • Interconnect at PCC: point of common coupling to MV switchgear
  • Fire / safety setbacks: per Thai fire code (5 m from buildings, 3 m between containers)

C.6.3 Capacity formula

BESS sizing is decision-driven, not geometry-driven:

  • Curtailment recovery: size to capture top 10–20% of PV generation peaks
  • Demand charge management: size to shave peak demand × 2 hours (typical Thai industrial 16:00–19:00 peak window)
  • Time-shift: size depends on TOU spread

Typical estate sizing: 0.05–0.20 MWh per MWp PV (so 5–6 MWh BESS for 30–40 MWp PV; matches BP memory reference).

C.6.4 CAPEX formula

CAPEX = MWh × unit cost (LFP)

  • LFP container cost (canonical): $175/kWh (April 2026 update; replaces older $400/kWh per memory edit 16)
  • Thermal management premium: +\(10–15/kWh** (HVAC, fire suppression, monitoring) — total **\)185–190/kWh all-in
  • Soft costs (commissioning, grid interconnect, EMS integration): +5–10% on hardware
  • Mid-life replacement at Y12: $80–120/kWh (per BNEF cost-curve trajectory; replace cells, retain container/HVAC/inverters)

Note: BESS unit cost basis is $/kWh, not \(/kWp. Direct comparison to the solar memory range (\)700–1,100/kWp) is not meaningful for BESS.

For LC's hypothetical 5.5 MWh BESS (LC is no-BESS in v1.0, but as illustration): 5,500 kWh × $185 + 7% soft costs = $1.09M.

C.6.5 "Yield" model — throughput, not yield

  • Round-trip efficiency: 88–92% (LFP standard; 90% canonical)
  • Cycle life: 6,000–8,000 cycles at 80% depth-of-discharge (DOD)
  • Calendar life: 12–15 years before significant degradation
  • Annual throughput: depends on dispatch strategy (typical industrial 250–350 cycles/year)
  • Degradation curve: ~3% per year initial; mid-life replacement Y12 at ~70% original capacity

C.6.6 Offtaker logic

  • Sited at IEAT load centre → IEAT-direct (IEAT pays for demand charge service)
  • Sited at tenant load centre → tenant-attributed
  • Curtailment recovery → revenue accrues to PV offtaker

C.6.7 Suitability screen

Estate Suitability Notes
LC NO Design choice: BTM only, no curtailment, no demand-charge sufficient to justify
BP YES Demand-charge management + carbon revenue context
Bangplee YES BESS at tenant load centres
Lat Krabang YES Similar to Bangplee
MTP YES Massive load profile
MTP Port YES Port operations have peak demand spikes
Songkhla MAYBE Coastal climate considerations
Other estates MAYBE Per estate-specific analysis

C.6.8 Failure modes

  • Cell degradation faster than nameplate
  • Thermal events (LFP safest chemistry but not zero-risk)
  • Mid-life replacement cost trajectory
  • Demand charge structure changes
  • Curtailment estimate vs actual behaviour
  • LFP cost curve divergence from BNEF forecast
  • Container thermal management failure in Thai heat

C.6.9 Locked vs estate-specific parameters

Parameter Status Value / range
Chemistry: LFP LOCKED (no NMC, no Lead-Acid for stationary)
Container size: 5 MWh LOCKED (40-ft ISO standard)
Round-trip efficiency LOCKED 88–92%
Cycle life: 6,000–8,000 LOCKED at 80% DOD
Calendar life LOCKED 12–15 years; mid-life replacement Y12
Unit cost: $175/kWh ESTATE-SPECIFIC + thermal premium $10–15/kWh
Sizing (MWh per MWp PV) ESTATE-SPECIFIC 0.05–0.20
Revenue stack composition ESTATE-SPECIFIC curtailment / demand charge / time-shift weighting
Mid-life replacement cost ESTATE-SPECIFIC BNEF curve; refresh annually
Discharge duration ESTATE-SPECIFIC 1-hr or 2-hr standard
Fire / safety setback LOCKED per Thai fire code

C.6.10 BESS as a cross-typology layer

Unlike T1–T6W (which are spatial typologies occupying distinct surfaces), BESS is a temporal/functional layer that pairs with PV. The methodology treats BESS as the 6th typology for procurement and modeling consistency, but the underlying analytical structure is different: BESS is sized per estate's revenue stack composition, not per-segment.

Cross-references: - BESS interacts with B.4 yield (curtailment recovery depends on PV generation profile) - BESS interacts with B.6 offtaker attribution (demand-charge revenue accrues to load owner) - BESS interacts with Part D financial modelling (cycle dispatch, mid-life replacement, demand-charge revenue)


C.7 Cross-typology summary table

Typology LC segs LC MWp LC CAPEX LC v1.0 $/kWp (canonical) vs memory range ($700–1,100) Confidence (LC) Offtaker default
T1 rooftop 12 2.15 $0.89M $412 BELOW range; engineering review priority HIGH IEAT-direct
T2 ground-mount 7 4.35 $3.54M $813 mid-range HIGH IEAT-direct
T4A carport 7 11.35 $8.42M $742 lower bound HIGH IEAT-direct (all)
T4B-DC arterial 16 1.83 $1.28M $700 lower bound (single-mob conditional) MEDIUM mixed (per side)
T6W canal canopy 5 14.91 $10.91M $732 lower bound MEDIUM tenant-attributed (all)
BESS 0 0 $0 $175/kWh + thermal n/a (different basis: $/kWh) n/a LC no-BESS
TOTAL (PV) 47 34.59 $25.04M weighted $724/kWp within memory range mixed 52% IEAT / 48% tenant

LC envelope split by typology: - T6W is largest single-typology contributor by CAPEX (44%) and capacity (43%) - T4A is the IEAT-direct flagship (33% by capacity, 34% by CAPEX, all IEAT-direct) - T1 + T2 + T4A (IEAT-direct family) = 19.85 MWp / $12.85M = 51% by CAPEX - T4B-DC + T6W (tenant-attributed family) = 16.74 MWp / $12.19M = 49% by CAPEX

The 52/48 split per LC IC paper §2 reflects the underlying typology distribution.

Memory-range observation: weighted average across all 5 PV typologies at LC is $724/kWp — within memory range. Four of five typologies are at or below the lower bound; T1 is below range. The weighted average lands inside the range largely because T6W (highest absolute CAPEX share, 44%) is at $732 — close to the lower bound but above it.


C.8 Acknowledged Part C gaps

  1. T1 unit cost below memory range ($412 vs $700–1,100 floor) — WP2 engineering review priority. Confirm LC-specific advantages explain the gap or revise the LC v1.0 number.
  2. Per-typology methodology canonical CAPEX does not exist — AUDIT-040 / Annex H is the deliverable. WP2 + WP4 engineering review produces per-typology canonical via documented LC-specific cost drivers compared against engineering-validated cost stack. Annex H lock is the gating event for the v1.1.0 methodology document.
  3. C4 corrosion premium application (AUDIT-002) — across all typologies for coastal estates; needs verification in unit cost build-up
  4. Bifacial uplift typology-specific values (AUDIT-041) — model uses estate-canonical only; per-typology uplifts need application
  5. T4B-DC single-mob vs phased per-estate decision — methodology assumes single-mob; if procurement forces phased, +25% premium applies
  6. T6W LC2 Power Plant power-producer ESA sub-class — formalise this offtaker type
  7. BESS revenue stack composition per estate — Part D treatment needs to specify weighting
  8. Per-typology cleaning / O&M frequency — methodology has flat $20/kWp/yr O&M base; per-typology breakdown (T6W monthly vs others quarterly) needs explicit Part D treatment (AUDIT-016)
  9. Reserve typology promotion rules (T1X / T2X / T6X) — methodology needs explicit Phase 0A/0B promotion criteria

These gaps are tracked in audit register (R3 v0.3) and folded into v1.1 work plan.


C.9 References

  • NC-IS-LC-001 LC Investment Segment Register v1.0 — per-segment data for 47 active + aspirational
  • NC-IC-LC-001 IC Paper v1.1 — investment thesis with per-typology breakdown
  • NC-FM-LC-001 LC Financial Model v1.0 — Active_Envelope tab with per-typology data
  • NC-MN-001-R3_audit_v0_3 — live audit register
  • Memory edits 1–30 (per memory_user_edits view 12 May 2026); particularly edit 16 for solar $700–1,100/kWp canonical range
  • NC-METH-001 v1.1.0 Part A — framing conventions
  • NC-METH-001 v1.1.0 Part B — pipeline stages B.2, B.3, B.5

End of Part C v1.1.0-revA.